
Kpa-clawbotandopenclaw-bot
1116801b2f
M5: emoji → Phosphor Icons — settings & customize (#1648) (#1653)
**Red commit:** `851cc8c3a024b1675558092d772444bf4f1ec625` — failing
test on a stub branch (will link CI run after PR opens).
Partial fix for #1648 (M5 of 6). **Do NOT close the tracking issue** —
M6 (server-side residual emoji sweep + lint gate) still pending.
## Per-file swap counts
| File | Phosphor `<use>` refs | Notes |
|---|---|---|
| `public/customize.js` | 20 | DEFAULTS → `ph:<name>` tokens; render
path keeps legacy emoji branch (back-compat) |
| `public/customize-v2.js` | 26 | same as v1; cv2 overrides path
unchanged |
| `public/home.js` | (helpers added) | `_renderHomeGlyph` /
`_renderHomeLabel` accept both `ph:<name>` and legacy emoji |
| `public/geofilter-builder.html` | 5 | clear / undo / save / load
buttons (+inline `.ph-icon` CSS) |
| `public/audio.js` | 1 | audio unlock prompt |
| `public/filter-ux.js` | 5 (3 new) | help popover star + close,
saved-filter delete |
| `public/style.css` | 0 | `#chList .ch-share-btn::before { content: '📤'
}` removed; JS now renders an inline sprite |
| `cmd/server/routes.go` | (6 `ph:` tokens) | onboarding home defaults
updated in lockstep with customize-v2.js |
## Operator config back-compat — PROMINENT
Per design call #1 (user-locked): existing operator-stored emoji values
in `config.json` / `localStorage` are **NOT** touched. The render path
supports both:
```js
function renderConfigGlyph(value) {
var m = String(value || '').match(/^ph:([a-z][a-z0-9-]+)$/);
if (m) return '<svg class="ph-icon"><use href="/icons/phosphor-sprite.svg#ph-' + m[1] + '"/></svg>';
return esc(value); // EMOJI-OK-LEGACY-RENDER — operator-stored emoji/text path
}
```
Defaults flipped to `ph:<name>` tokens, so new operators (and operators
who hit "Reset to Defaults") see Phosphor sprites. Operators with stored
emoji values continue to see their emoji exactly as before. Verified
end-to-end (see E2E (b) below).
## cmd/server/routes.go — changed in lockstep
Per design call #2: the home-defaults `steps` / `footerLinks` mirror the
JS DEFAULTS, so they MUST update together. routes.go now emits
`ph:<name>` tokens; the frontend home-render path resolves them.
Existing tests (`TestConfigThemeHomeDefaults`) still pass — they assert
structure, not glyph values.
## E2E assertions added
- `test-issue-1648-m5-emoji-scan.js` — per-file zero-emoji + ph-token
DEFAULTS + sprite presence
- `test-issue-1648-m5-icons-e2e.js`:
- (a) customize chrome — tabs/header rendered as sprites; chrome text
icon-free
- **(b) back-compat — injects fake `🐙` operator step into localStorage,
reloads, opens customize, asserts the emoji renders verbatim in both the
input value AND the live preview span; asserts the ph-token step renders
as a sprite** (design call #1 in action)
- (c) `/channels` modal sprite count
- (d) `/audio-lab` sprite presence
- (e) `geofilter-builder.html` control buttons sprite-driven
- (f) every `<use>` resolves to a defined symbol id
## Out of scope (M6 cleanup)
- cmd/server/routes.go residual server-rendered emoji **not** tied to
customize defaults (none found by my grep — file already audited)
- `make lint-no-emoji` CI grep gate (M6 owns it)
- `public/icons/README.md` workflow doc
cross-stack: justified — design call #2 requires Go + JS update
together.
---------
Co-authored-by: openclaw-bot <bot@openclaw.local>
2026-06-11 05:04:29 -07:00
..
2026-04-21 09:09:39 -07:00
2026-04-03 13:51:13 -07:00
2026-05-21 14:00:15 -07:00
2026-05-21 14:00:15 -07:00
2026-04-05 14:50:40 -07:00
2026-05-21 14:00:15 -07:00
2026-05-03 17:56:42 -07:00
2026-05-03 17:56:42 -07:00
2026-05-17 16:13:11 +00:00
2026-05-18 22:51:23 -07:00
2026-05-18 22:51:23 -07:00
2026-05-18 22:51:23 -07:00
2026-05-18 22:51:23 -07:00
2026-06-04 03:21:26 -07:00
2026-04-12 18:09:23 -07:00
2026-06-04 13:14:09 +00:00
2026-06-04 13:14:09 +00:00
2026-05-21 14:00:15 -07:00
2026-04-20 21:46:34 -07:00
2026-05-25 17:45:32 -07:00
2026-05-25 22:16:14 -07:00
2026-06-07 03:43:29 -07:00
2026-06-07 03:43:29 -07:00
2026-06-07 03:43:29 -07:00
2026-06-07 03:43:29 -07:00
2026-06-07 03:43:29 -07:00
2026-06-03 13:58:04 -07:00
2026-06-06 22:45:05 -07:00
2026-06-04 18:48:27 -07:00
2026-05-19 01:17:12 -07:00
2026-05-18 12:27:44 -07:00
2026-05-19 01:17:12 -07:00
2026-06-04 18:48:27 -07:00
2026-05-21 14:00:15 -07:00
2026-05-21 11:39:49 -07:00
2026-05-21 11:39:49 -07:00
2026-05-21 11:39:49 -07:00
2026-05-19 23:53:41 -07:00
2026-06-06 22:45:05 -07:00
2026-06-09 03:23:48 -07:00
2026-05-30 13:22:41 -07:00
2026-05-30 13:22:41 -07:00
2026-05-30 13:22:41 -07:00
2026-06-06 20:46:42 -07:00
2026-06-04 14:41:00 -07:00
2026-05-16 17:28:40 +00:00
2026-05-29 01:08:12 -07:00
2026-06-08 01:27:13 -07:00
2026-05-15 22:34:21 -07:00
2026-05-15 22:34:21 -07:00
2026-05-19 08:08:28 -07:00
2026-05-05 01:16:57 -07:00
2026-05-05 01:16:57 -07:00
2026-06-04 23:48:47 -07:00
2026-05-21 14:00:15 -07:00
2026-04-16 00:09:36 -07:00
2026-05-16 20:56:52 +00:00
2026-06-04 16:27:48 -07:00
2026-05-05 01:58:52 -07:00
2026-05-19 23:53:41 -07:00
2026-03-31 01:10:56 -07:00
2026-05-31 14:54:21 -07:00
2026-06-08 22:13:02 -07:00
2026-05-29 02:42:21 -07:00
2026-04-18 11:52:22 -07:00
2026-04-18 11:52:22 -07:00
2026-05-19 23:53:41 -07:00
2026-06-07 09:28:51 -07:00
2026-04-03 13:11:59 -07:00
2026-05-15 16:21:14 +00:00
2026-05-16 19:55:00 +00:00
2026-06-04 23:48:47 -07:00
2026-05-15 20:24:55 -07:00
2026-05-15 22:46:25 -07:00
2026-05-17 16:13:11 +00:00
2026-06-06 22:45:05 -07:00
2026-06-06 20:46:42 -07:00
2026-04-20 22:15:02 -07:00
2026-05-21 14:00:15 -07:00
2026-04-21 04:51:24 +00:00
2026-05-02 20:35:15 -07:00
2026-05-17 16:13:11 +00:00
2026-05-19 08:08:28 -07:00
2026-05-18 23:19:27 -07:00
2026-06-06 22:44:59 -07:00
2026-06-04 14:41:22 -07:00
2026-06-07 03:43:29 -07:00
2026-05-28 15:06:30 -07:00
2026-05-28 15:06:30 -07:00
2026-04-20 23:10:33 -07:00
2026-05-25 22:35:35 -07:00
2026-05-03 08:56:09 -07:00
2026-05-21 14:00:15 -07:00
2026-06-09 01:24:46 -07:00
2026-06-09 01:24:46 -07:00
2026-04-02 23:45:03 -07:00
2026-05-15 09:16:39 -07:00
2026-05-15 09:16:39 -07:00
2026-05-29 02:42:21 -07:00
2026-05-29 02:42:21 -07:00
2026-05-29 02:42:21 -07:00
2026-05-29 02:42:21 -07:00
2026-05-16 10:14:44 -07:00
2026-04-30 09:25:51 -07:00
2026-05-16 19:55:00 +00:00
2026-05-19 23:53:41 -07:00
2026-05-19 23:53:41 -07:00
2026-05-19 23:53:41 -07:00
2026-05-05 01:41:00 -07:00
2026-05-05 01:41:00 -07:00
2026-04-17 23:43:05 +00:00
2026-06-08 01:27:13 -07:00
2026-06-09 00:27:56 -07:00
2026-06-09 03:23:48 -07:00
2026-06-09 03:23:48 -07:00
2026-06-09 00:27:56 -07:00
2026-06-09 03:23:48 -07:00
2026-05-18 09:22:27 -07:00
2026-05-18 07:36:33 -07:00
2026-04-03 13:33:26 -07:00
2026-05-01 23:11:27 -07:00
2026-05-29 01:08:12 -07:00
2026-05-29 01:08:12 -07:00
2026-05-29 02:42:21 -07:00
2026-05-29 02:42:21 -07:00
2026-06-08 01:27:13 -07:00
2026-04-05 15:05:20 -07:00
2026-05-18 23:52:27 -07:00
2026-05-17 16:13:11 +00:00
2026-05-25 22:32:00 -07:00
2026-06-04 23:48:47 -07:00
2026-05-15 22:46:28 -07:00
2026-05-15 22:46:28 -07:00
2026-05-15 22:46:28 -07:00
2026-05-15 22:46:28 -07:00
2026-05-15 22:46:28 -07:00
2026-05-15 22:46:28 -07:00
2026-05-15 22:46:28 -07:00
2026-05-18 23:19:30 -07:00
2026-05-28 15:02:59 -07:00
2026-05-28 14:55:59 -07:00
2026-05-25 06:03:10 +00:00
2026-05-02 11:15:25 -07:00
2026-05-08 16:29:23 -07:00
2026-05-08 16:29:23 -07:00
2026-05-08 16:29:23 -07:00
2026-05-08 16:29:23 -07:00
2026-06-07 09:28:51 -07:00
2026-05-05 17:56:56 -07:00
2026-06-07 09:28:51 -07:00
2026-04-01 19:26:11 -07:00
2026-06-06 22:45:05 -07:00
2026-05-15 09:16:39 -07:00
2026-05-25 22:35:35 -07:00
2026-05-03 19:50:01 -07:00
2026-06-06 20:46:24 -07:00
2026-06-06 20:46:24 -07:00
2026-05-21 11:39:43 -07:00
2026-05-20 20:57:02 -07:00
2026-05-28 15:01:58 -07:00
2026-05-28 15:01:58 -07:00
2026-06-06 20:46:42 -07:00
2026-06-06 20:46:42 -07:00
2026-05-05 02:33:27 -07:00
2026-05-20 20:57:02 -07:00
2026-05-20 20:57:02 -07:00
2026-05-20 20:57:02 -07:00
2026-05-15 16:21:14 +00:00
2026-05-15 09:16:39 -07:00
2026-06-08 01:27:13 -07:00
2026-05-17 16:42:01 -07:00
2026-04-20 19:55:00 -07:00
2026-06-04 15:37:37 -07:00
2026-05-18 07:36:28 -07:00
2026-05-03 17:56:12 -07:00
2026-05-21 14:00:15 -07:00
2026-06-06 22:45:05 -07:00
2026-06-11 05:04:29 -07:00
2026-05-15 16:21:14 +00:00
2026-05-03 17:40:54 -07:00
2026-06-03 13:58:04 -07:00
2026-04-20 23:10:33 -07:00
2026-04-21 09:09:39 -07:00
2026-06-09 01:24:46 -07:00
2026-05-29 02:42:21 -07:00
2026-06-06 21:59:23 -07:00
2026-05-03 17:41:22 -07:00
2026-05-03 17:41:22 -07:00
2026-05-21 14:00:15 -07:00
2026-04-20 19:55:00 -07:00
2026-04-20 19:55:00 -07:00
2026-05-28 05:22:08 -07:00
2026-06-08 01:27:13 -07:00
2026-03-30 03:42:11 +00:00
2026-05-21 11:39:49 -07:00