docs: record Phase 0/7 hardware characterization results
Hardware run of the outstanding Phase 0 (teardown timing) and Phase 7 (fault-injection) items on V3 (non-PSRAM, 1 wss slot) and V4 (PSRAM, 3 wss slots) observer nodes, both flashed with this branch. Primary finding (release-gating): MQTT_STOP_TIMEOUT_MS=8000 is too small. Per-wss-slot teardown is ~5-6s sequential, so healthy multi-slot stops (2 slots at the non-PSRAM max, 3+ on PSRAM) exceed 8s, trip the dirty/timeout fallback, and the OTA barrier withholds flashing -- so multi-slot nodes could never ota update, and the forced path also stalls the loop task ~15-27s. Recommend raising the timeout (slot-count-aware preferred, e.g. 4s + 6s*active_slots) before Phase 5 ships. Phase 7: no heap leak or crash across the representative fault-injection matrix on either board (incl. repeated forced teardowns); non-PSRAM reconfigure-churn fragmentation is bounded and fully reboot-recoverable; PSRAM largest-block rock-stable. OTA barrier latch validated on hardware in both clean and dirty states.
This commit is contained in:
@@ -26,17 +26,154 @@ index.
|
||||
| 1 | PR CI smoke builds + ArduinoJson pin enforcement | Done (build-size gate and ASan/UBSan still pending) |
|
||||
| 2 | PSRAM restart resource symmetry | Done |
|
||||
| 3 | MQTT preference migration fixtures | Done (filesystem adapter still lives in `CommonCLI`) |
|
||||
| 0 | Pre-change lifecycle characterization | Deterministic behavior encoded in Phase 4/5; hardware items pending (stop-timeout value is a placeholder) |
|
||||
| 0 | Pre-change lifecycle characterization | Hardware run 2026-07-19 (see "Hardware Characterization Results"): teardown timing measured on V3+V4. **Finding: `MQTT_STOP_TIMEOUT_MS=8000` is too small — trips dirty/OTA-withheld on healthy multi-slot nodes; fix pending review** |
|
||||
| 4 | Ownership and teardown test seams | Seams + ownership doc + teardown tests done; production rewiring deferred to Phase 5 |
|
||||
| 5 | Cooperative MQTT shutdown | Minimal cooperative `end()` + `begin()` guard + OTA barrier implemented on branch `phase5/cooperative-mqtt-shutdown` (native green, firmware smoke build green); NOT hardware-validated. Volatile-handshake replacement + snapshot-consumer repointing deferred |
|
||||
| — | OTA teardown barrier | Implemented — flash gated on a clean MQTT stop in `simple_repeater`; not hardware-validated |
|
||||
| 6 | Request/queue/connection/publication integration tests | Not started |
|
||||
| 7 | Uptime, memory, and fault-injection gates | Not started |
|
||||
| 7 | Uptime, memory, and fault-injection gates | Representative HW matrix run 2026-07-19: V3 non-PSRAM + V4 PSRAM done (no leak/crash; forced-path OTA-withhold + ~15–27 s loop stall observed). Multi-day soak + stack-HWM build pending |
|
||||
|
||||
Forward plan, in execution order: **Phase 0 → Phase 4 → Phase 5 (with the OTA
|
||||
teardown barrier) → Phase 6 → Phase 7.** Do not reopen a "Done" phase without a
|
||||
deliberate reason (see "Change-Control Discipline").
|
||||
|
||||
## Hardware Characterization Results (Phase 0 & Phase 7) — 2026-07-19
|
||||
|
||||
Hardware run of the outstanding Phase 0 (pre-change/cooperative teardown timing)
|
||||
and Phase 7 (uptime/memory/fault-injection) items against two live observer
|
||||
nodes. **Not yet committed as a plan change — this section records measured
|
||||
results and a release-gating recommendation for review.**
|
||||
|
||||
### Setup
|
||||
|
||||
- **V3** — Heltec WiFi LoRa 32 **V3**, non-PSRAM (max 2 active slots), env
|
||||
`Heltec_v3_repeater_observer_mqtt`, 1 configured slot (`meshmapper`, wss).
|
||||
- **V4** — Heltec WiFi LoRa 32 **V4**, **2 MB PSRAM** (max 5 active slots), env
|
||||
`heltec_v4_repeater_observer_mqtt`, 3 configured slots (`analyzer-us`,
|
||||
`cascadiamesh`, `waev`, all wss). mbedTLS + JSON/raw buffers allocate in PSRAM.
|
||||
- Both flashed with this branch (`phase5/cooperative-mqtt-shutdown`) via
|
||||
`pio run -t upload` (app-slot flash only; `nvs`+`spiffs` preserved, no erase).
|
||||
Note: `FIRMWARE_VERSION`/`FIRMWARE_BUILD_DATE` are hardcoded in `MyMesh.h` and
|
||||
were not bumped, so `ver` reads "v1.16.0 (6 Jun 2026)" on both old and new
|
||||
builds — confirm the flash by behavior (the `(clean)` / cooperative-stop log
|
||||
lines), not by `ver`.
|
||||
- Driven over the serial CLI (`set bridge.enabled off/on` = `end()`/`begin()`;
|
||||
`set mqttN.*` = slot reconfigure; `get mqtt.stats` = `Free`/`Max`(largest
|
||||
block)/queue/outbox/per-slot counters). Host-side timestamped log parsing.
|
||||
|
||||
### PRIMARY FINDING — `MQTT_STOP_TIMEOUT_MS = 8000` is too small (release-gating)
|
||||
|
||||
Per-wss-slot teardown costs **~5–6 s**, applied **sequentially**
|
||||
(`destroySlotClients()`: `disconnect()` → 50 ms → `esp_mqtt_client_destroy()`;
|
||||
the ~5 s is the esp-mqtt task/network close, not the 50 ms settle). This is
|
||||
unchanged from the pre-change path (same teardown code), so the cooperative
|
||||
`end()` ack time scales with the number of connected slots:
|
||||
|
||||
| Config | Slots | Measured teardown | vs 8 s timeout | Result |
|
||||
|--------|-------|-------------------|----------------|--------|
|
||||
| V3 non-PSRAM | 1 wss | ack ~5.3–6.2 s (avg 5.8) | under | **clean** ✅ |
|
||||
| V3 non-PSRAM (design max) | 2 wss | ~11–12 s (cut off at 8 s) | **over** | **forced/dirty → OTA withheld** ❌ |
|
||||
| V4 PSRAM (normal config) | 3 wss | ~16 s (cut off at 8 s; per-slot disc @2.2/7.8/10.6 s) | **over** | **forced/dirty → OTA withheld** ❌ |
|
||||
| V4 PSRAM (design max) | 5 wss | ~27–30 s projected | **far over** | forced/dirty → OTA withheld ❌ |
|
||||
|
||||
Pre-change (v1.16.0) reference teardown (same nodes, blocking `end()`): 1 slot
|
||||
~6.1 s (V3), 3 slots ~16.4 s (V4) — consistent with the above.
|
||||
|
||||
**Consequence:** at the non-PSRAM board's *designed maximum* of 2 wss slots, and
|
||||
on a *normal healthy* 3-slot PSRAM node, an ordinary cooperative shutdown exceeds
|
||||
8 s → the coordinator fires `StopTimedOut` → sets the dirty latch → force-kills
|
||||
the MQTT task (the exact mbedTLS-mid-teardown path Phase 5 exists to avoid) and
|
||||
`canFlashAfterStop()` returns false. Because the OTA barrier only flashes after a
|
||||
**clean** stop, this means **any multi-slot device would have `ota update`
|
||||
permanently withheld** with the current timeout — the barrier misclassifies
|
||||
healthy stops as dirty. This inverts the barrier's intent and must be fixed
|
||||
before Phase 5 ships.
|
||||
|
||||
**Recommendation (needs review — a Phase 5 code change, not applied here):**
|
||||
|
||||
- Raise `MQTT_STOP_TIMEOUT_MS` so healthy multi-slot teardowns complete cleanly.
|
||||
Either a single constant sized for the 5-slot PSRAM worst case (**≥ ~35 s**,
|
||||
with headroom), or — preferred — **make it slot-count-aware**, e.g.
|
||||
`base 4 s + 6 s × active_slots` (2→16 s, 3→22 s, 5→34 s).
|
||||
- A larger fixed timeout lengthens the loop-task stall on every stop
|
||||
(`ota update`, reconfigure-restart, `set bridge.enabled off`); the slot-aware
|
||||
form avoids penalizing 1-slot nodes.
|
||||
- Alternative/complementary (deeper Phase 5 work): shorten the per-slot
|
||||
`esp_mqtt_client_destroy()` wait so total teardown drops under a smaller
|
||||
timeout. Out of scope for this characterization; flagged for decision.
|
||||
|
||||
### Phase 0 — cooperative lifecycle (V3, non-PSRAM, this branch)
|
||||
|
||||
- 6× and 10× `begin→connect→end→restart` cycles: **all clean**, ack 5.3–6.2 s,
|
||||
end() loop-task block ≤6.9 s, restart→connect ~5.4 s.
|
||||
- **No leak across full stop/start cycles:** free heap flat (~137–142 k, varies
|
||||
only with the meshmapper outbox), largest free block stable (~115–129 k). This
|
||||
satisfies Phase 5's "no downward heap/largest-block trend across start/stop
|
||||
cycles" acceptance criterion on the non-PSRAM path.
|
||||
|
||||
### OTA teardown barrier
|
||||
|
||||
- Barrier **input** validated on hardware in both states: clean stops →
|
||||
`canFlashAfterStop()` true; forced/timeout stops log `OTA blocked` /
|
||||
`OTA flashing withheld` (= `canFlashAfterStop()` false). Confirmed
|
||||
`mayBeginFlash() == (Stopped && !_stop_timed_out)`; a fresh start clears the
|
||||
latch; a dirty stop still permits restart.
|
||||
- Barrier **action** (`simple_repeater` aborts+resumes vs. proceeds) is a
|
||||
one-line gate on that latch (`MyMesh.cpp` deferred-OTA site) — validated by
|
||||
code + the Phase 4 host lifecycle tests.
|
||||
- **Not exercised end-to-end on hardware:** the live `ota update` deferred-flash
|
||||
path. A plain `pio run` build reports `ERR: OTA not configured (build via
|
||||
build.sh)`, so `otaFromManifest` bails before scheduling; driving it needs a
|
||||
`build.sh` firmware + a controlled manifest, and was not improvised on working
|
||||
fleet nodes (risk of flashing a real fleet build). Recommend a dedicated
|
||||
bench run for this.
|
||||
|
||||
### Phase 7 — fault-injection matrix (V3 non-PSRAM; representative, not the soak)
|
||||
|
||||
Matrix: 10 clean stop/start + 5 forced 2-slot teardowns + 8 slot-reconfigure +
|
||||
4 down-broker (`wss://192.0.2.1`) flaps. Time series of free/largest-block/
|
||||
queue/outbox recorded per step; reboot/crash detection on.
|
||||
|
||||
- **No crash across the entire matrix** (incl. 5 repeated force-kill fallbacks) —
|
||||
the reviewed dirty-stop fallback is robust on non-PSRAM.
|
||||
- **Forced teardown reproducible:** every 2-slot stop timed out (acks 7.4–8.2 s),
|
||||
reinforcing the primary finding.
|
||||
- **Bounded fragmentation, fully recoverable:** slot-level reconfigure/flap
|
||||
churn (which keeps a disabled slot's persistent client until a *full* bridge
|
||||
restart) dropped the largest free block from ~125 k to ~72 k and held ~17 k of
|
||||
free heap, but it **plateaued** (stable across 12 churn iterations, not an
|
||||
unbounded leak) and a reboot fully restored ~141 k free / ~125 k largest block.
|
||||
This is pre-existing bridge behavior (TLS-context lifecycle), not a Phase 5
|
||||
regression.
|
||||
|
||||
### Phase 7 — forced-teardown stress (V4 PSRAM, 3 wss slots, this branch)
|
||||
|
||||
8× `end()`/`begin()` cycles at the node's normal 3-slot config (every stop
|
||||
exceeds 8 s → forced/dirty):
|
||||
|
||||
- **All 8 forced, no leak, no crash.** Largest free block **rock-stable at
|
||||
139 252 across all 8 cycles** (mbedTLS is PSRAM-allocated, so internal-heap
|
||||
fragmentation is absent on the PSRAM path); free internal heap flat. The
|
||||
force-kill fallback is robust on PSRAM too.
|
||||
- **Loop-task stall is severe on the forced path:** `end()` blocked the loop
|
||||
task **~15–27 s** per stop, because the forced path waits the full 8 s timeout
|
||||
and *then* runs a complete redundant teardown on Core 1 (≈ 8 s + ~16 s). During
|
||||
that window the repeater's mesh/CLI/radio servicing is stalled. Sizing the
|
||||
timeout so the cooperative (Core-0) teardown completes cleanly removes both the
|
||||
OTA-withhold and this double-teardown stall.
|
||||
- Both nodes left restored to their original config, bridge on, heap healthy.
|
||||
|
||||
### Limitations / not covered
|
||||
|
||||
- Task stack high-water mark and explicit task/client counts are not exposed by
|
||||
the CLI; a dedicated `MQTT_MEMORY_DEBUG` build is needed for those (heap
|
||||
stability was used as a proxy leak signal, and it held).
|
||||
- The 72 h / 7-day soaks were not run (bounded representative cycles per agreed
|
||||
scope); WiFi loss/recovery, TLS-handshake failure, queue saturation, JWT/NTP
|
||||
failure, and `millis()`-rollover scenarios need external network control /
|
||||
time injection and were not driven over serial.
|
||||
- Both devices left restored to their original slot config with the bridge on.
|
||||
|
||||
## Current Baseline
|
||||
|
||||
The current branch has:
|
||||
@@ -418,10 +555,16 @@ publishing a plain-data status snapshot to repoint the §1/§2 consumers in
|
||||
that can still touch a torn-down bridge). Those are not required to fix the OTA
|
||||
panic and would enlarge the merge-sensitive diff.
|
||||
|
||||
**Phase 0 dependency still open:** `MQTT_STOP_TIMEOUT_MS` is a conservative 8 s
|
||||
placeholder. It must be characterized against real mbedTLS teardown over `wss`
|
||||
with a down broker (Phase 0) before this ships; it is a single named constant so
|
||||
that change is trivial.
|
||||
**Phase 0 dependency — CHARACTERIZED 2026-07-19, ACTION REQUIRED:**
|
||||
`MQTT_STOP_TIMEOUT_MS` = 8 s placeholder is **too small**. Measured per-wss-slot
|
||||
teardown is ~5–6 s sequential, so a healthy stop needs ~11–12 s at 2 slots
|
||||
(non-PSRAM max) and ~16 s at 3 slots / ~27–30 s at 5 slots (PSRAM). At 8 s these
|
||||
healthy stops trip the dirty/timeout fallback and the OTA barrier withholds
|
||||
flashing — i.e. multi-slot nodes could never `ota update`. Raise it (single
|
||||
constant ≥ ~35 s for the 5-slot worst case, or preferably slot-count-aware,
|
||||
e.g. `4 s + 6 s × active_slots`) before this ships. See "Hardware
|
||||
Characterization Results (Phase 0 & Phase 7)". It is a single named constant so
|
||||
the change is trivial.
|
||||
|
||||
The original plan of record follows. Replace direct task deletion with an
|
||||
explicit lifecycle such as:
|
||||
|
||||